Aston Martin V8 Restoration
> The right hand side
Aston Martin Restoration - The Right Hand Side
[Login]
6 of 18
Jump to:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Crossmember Repair
Description
:
The jacking point mounting on the front crossmember needed to be repaired, as did the flange at the very front of the floor. With these repairs complete the sills could be fitted.
6 of 18
Jump to:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
© aston-v8.co.uk 2005.
. Hosted by VORD
Gallery Hosting